Upcoming Golf Course Projects
This phase is made up of improvements on holes #7-9. The limit of construction is to the north of Woolworth between holes #12/#13 to the west, #10 to the east and #11 to the north. #7 would shift to the west for the second shot with a new green built near current #12 tee box. This area is unused currently and was the site of the old maintenance facility (new maintenance facility was constructed outside the golf course perimeter at 39th and Pacific in 2008). A new par 3, new #8, would then be constructed playing to the east with the new green near current #7 green. Current #8 would then convert to #9 and the current tee box for #9 would be removed to allow for a bail-out shot for #8 to the right.
Phase 2:
Golf Course Master Plan


October 20th, 2025
Hole #10 & Hole #11
New fairway shaping on Hole #10 and addition of another bunker.
New irrigation for Hole #10 and #11.
November 11th, 2025
Hole #10 & Hole #11 Completed
Over 30,000 square feet of sod laid down. Plan to open the newly renovated holes will be Spring of 2026 when sod roots

New Hole #7 Simulation
Details:
Removal of existing asphalt and replace with concrete similar to other paths completed in last 10 years. Scope includes #7 green to #8 Fairway; #8 Green to #9 Woolworth; #10 Tee to #11 Fairway. Those in RED would be removed upon Phase 2 of the Golf Course Master Plan; that portion totals $75,000 (included in total estimate that follows).

New Hole #8 Simulation
Details:
The new Hole #8 will convert to a par 3 and will have space to the right of the Hole for a "bail-out shot".

Phase 3:
Golf Course Master Plan
This phase is made up of improvements on holes #17 and #18. The limit of construction is to the south of Woolworth between holes #6/7 to the west, the Clubhouse and #16 to the east, and #15 to the south. #18 will have a new green constructed in the fairway of current #9. A new tee complex will be built for #18 near current #17 green. A new green complex will be built for #17 near current #18 tee complex with a new tee complex near the split rail fence on the southwest corner of the existing parking lot. The project as currently designed includes a short-game practice facility at the location of current #17 tee complex and is included in the estimated costs.

November 21st, 2025
Updated Cart Path:
Removal of existing asphalt and replace with concrete similar to other paths completed in last 10 years. Scope includes #4 Green to #5 Tee; #5 Green to #6 Tee, #9 Approach, #13 Green to #14 Tee, #15 Green through #16 to #17 Tee, #17 Green to #18 Tee. Those in RED would be removed upon Phase 3 of the Golf Course Plan; that portion totals $80,000 (included in estimate that follows).

New Hole #17 Simulation
Details:
A new tee complex will be built near Hole #17. A new green complex will be built for #17 near current #18 tee complex with a new tee complex near the split rail fence on the southwest corner of the existing parking lot.

New Hole #18 Simulation
Details:
#18 will have a new green constructed in the fairway of current #9. A new tee complex near the split rail fence on the southwest corner of the existing parking lot will be built.